Infrastructure Pedestrian & bicycle bridge Ostersund , Sweden
Steel
The largest single-piece installation by UPB. The 67t stainless steel bridge was manufactured completely offsite to ensure high quality, swift installation, and less on-site labour.
See the video of installation process here.
Key facts:
- Type: Pedestrian and bicycle bridge
- Location: Östersund, Sweden
- Delivery: 5 x segments produced off-site
- Total span: 56m
- Total weight: 67.3 t
- Material: DUPLEX stainless steel
- Client: Svevia